大网数据广告活动
域与目录服务

Determining the Schedule

· 52CE 我爱测

Learn more about: Determining the Schedule

You can control site link availability by setting a schedule for site links. When replication between two sites traverses multiple site links, the intersection of the replication schedules on all the relevant links determines the connection schedule between the two sites.

To plan for setting the site link schedule, create two overlapping schedules between site links that contain domain controllers that directly replicate with each other. Use the default (100-percent available) schedule on those links unless you want to block replication traffic during peak hours. By blocking replication, you give priority to other traffic, but you also increase replication latency.

Domain controllers store time in Coordinated Universal Time (UTC). Time settings in site link object schedules conform to the local time of the site and computer on which the schedule is set. When a domain controller contacts a computer that is in a different site and time zone, the schedule on the domain controller displays the time setting according to the local time for the site of the computer.

Source: Microsoft Learn / Windows Server documentation by Microsoft and contributors (upstream author metadata: robinharwood). Documentation licensed CC BY 4.0. Code samples are covered by the MIT License. Converted from Markdown, with links normalized and embedded media omitted.

资料来源与适用范围

资料来源
Microsoft Learn / Windows Server documentation
适用范围
Windows Server · Source date 05/12/2025
内容语言
中文;命令、路径和错误标识保留技术原文
本地收录日期
2026-11-15
授权说明
CC BY 4.0 (documentation), MIT (code samples)

正文与所需资源由本站本地存储。查看来源及更新记录 ↗

请按适用版本和实际日志确认原因;本站没有对每一种系统或设备逐项执行文中的操作。